Update 2011-2
186 work sections now in NBS Building (excluding Preliminaries)
Our ongoing efforts to keep your specifications up-to-date have resulted in the following changes:
- Amendments to 35 sections, comprising:
– 4 work sections contain only amended references.
– 6 work sections contain improvements to general or clause guidance, without changes to the clause text.
– 25 work sections contain changes to clause text, with or without changes to general or clause guidance.
Standard
Intermediate
Minor Works
The list that follows highlights work sections in NBS Building Update 2011-2 which have undergone technical revisions.
Work Sections
|
|
|
B50 General structural requirements |
|
|
|
E20 Formwork for in situ concrete |
|
|
|
F31 Precast concrete sills/ lintels/ copings/ features |
|
|
|
H13 Structural glass assemblies |
|
|
|
H43 Metal composite panel cladding/ covering |
|
|
|
H60 Plain roof tiling |
|
|
|
H90 Tensile fabric coverings |
|
|
|
J21 Mastic asphalt roofing/ insulation/ finishes |
|
|
|
K11 Rigid sheet flooring/ sheathing/ decking/ sarking/ linings/ casings |
|
|
|
M41 Terrazzo tiling/ In situ terrazzo |
|
|
|
N13 Sanitary appliances and fittings |