NBS Landscape
Update 2010-3
Preliminaries |
|
|
|
SBCC 2005 Minor Works Building Contract (SBCC356A) |
|
A20 SBCC MINOR WORKS BUILDING CONTRACT (MW/Scot) |
|
Fourth Recital and Schedule Part 2 – BASE DATE |
|
Fifth Recital and Schedule Part 2 – BASE DATE |
|
Fourth Recital and Schedule Part 2 – BASE DATE |
|
SCHEDULE PART 4: CONTRACT DOCUMENTS |
|
A30 TENDERING/ SUBLETTING/ SUPPLY |
|
130 |
Clause deleted. |
596 |
New clause. |
A31 PROVISION, CONTENT AND USE OF DOCUMENTS |
|
145 |
New clause: Clause added to clarify meaning for terms used in work sections |
150 |
New clause: Clause added to clarify meaning for terms used in work sections |
155 |
New clause: Clause added to clarify meaning for terms used in work sections |
660 |
New clause. |
A34 SECURITY/ SAFETY/ PROTECTION |
|
470 |
New clause. |
555 |
New clause. |
|
|
JCT 2005 Minor Works Building Contract (JCT360A) |
|
A30 TENDERING/ SUBLETTING/ SUPPLY |
|
130 |
Clause deleted. |
596 |
New clause. |
A31 PROVISION, CONTENT AND USE OF DOCUMENTS |
|
145 |
New clause: Clause added to clarify meaning for terms used in work sections |
150 |
New clause: Clause added to clarify meaning for terms used in work sections |
155 |
New clause: Clause added to clarify meaning for terms used in work sections |
660 |
New clause. |
A34 SECURITY/ SAFETY/ PROTECTION |
|
470 |
New clause. |
555 |
New clause. |
|
|
JCT 2005 Minor Works Building Contract with Contractor's Design (JCT361A) |
|
A30 TENDERING/ SUBLETTING/ SUPPLY |
|
130 |
Clause deleted. |
596 |
New clause. |
A31 PROVISION, CONTENT AND USE OF DOCUMENTS |
|
145 |
New clause: Clause added to clarify meaning for terms used in work sections |
150 |
New clause: Clause added to clarify meaning for terms used in work sections |
155 |
New clause: Clause added to clarify meaning for terms used in work sections |
660 |
New clause. |
A34 SECURITY/ SAFETY/ PROTECTION |
|
470 |
New clause. |
555 |
New clause. |
|
|
JCLI 2008 Landscape Works Contract (JCLI410A) |
|
A30 TENDERING/ SUBLETTING/ SUPPLY |
|
596 |
New clause. |
A31 PROVISION, CONTENT AND USE OF DOCUMENTS |
|
145 |
New clause: Clause added to clarify meaning for terms used in work sections |
150 |
New clause: Clause added to clarify meaning for terms used in work sections |
155 |
New clause: Clause added to clarify meaning for terms used in work sections |
660 |
New clause. |
A34 SECURITY/ SAFETY/ PROTECTION |
|
470 |
New clause. |
555 |
New clause. |
|
|
JCLI 2008 Landscape Works Contract with Contractor's Design (JCLI415A) |
|
A30 TENDERING/ SUBLETTING/ SUPPLY |
|
596 |
New clause. |
A31 PROVISION, CONTENT AND USE OF DOCUMENTS |
|
145 |
Technical revision: Clause added to clarify meaning for terms used in work sections |
150 |
Technical revision: Clause added to clarify meaning for terms used in work sections |
155 |
Technical revision: Clause added to clarify meaning for terms used in work sections |
660 |
New clause. |
A34 SECURITY/ SAFETY/ PROTECTION |
|
470 |
New clause. |
555 |
New clause. |
|
|
ICE Conditions of Contract Minor Works (ICE450A) |
|
A20 ICE MINOR WORKS |
|
clause 3.7 – CONTRACTOR'S DESIGN |
|
2 – PAYMENT |
|
PARTNERING |
|
PARTNERING |
|
A30 TENDERING/ SUBLETTING/ SUPPLY |
|
130 |
Clause deleted. |
195 |
Clause deleted. |
596 |
New clause. |
A31 PROVISION, CONTENT AND USE OF DOCUMENTS |
|
145 |
New clause: Clause added to clarify meaning for terms used in work sections |
150 |
New clause: Clause added to clarify meaning for terms used in work sections |
155 |
New clause: Clause added to clarify meaning for terms used in work sections |
660 |
New clause. |
A34 SECURITY/ SAFETY/ PROTECTION |
|
470 |
New clause. |
555 |
New clause. |
|
|
Short Public Works Contract for Civil Engineering and Building Works Designed by the Employer (IrDoF498A) |
|
A31 PROVISION, CONTENT AND USE OF DOCUMENTS |
|
145 |
New clause: Clause added to clarify meaning for terms used in work sections |
150 |
New clause: Clause added to clarify meaning for terms used in work sections |
155 |
New clause: Clause added to clarify meaning for terms used in work sections |
A34 SECURITY/ SAFETY/ PROTECTION |
|
470 |
New clause. |
555 |
New clause. |
|
|
JCT Framework Agreement (JCT770A) |
|
A30 TENDERING |
|
596 |
New clause. |
A31 PROVISION, CONTENT AND USE OF DOCUMENTS |
|
145 |
New clause: Clause added to clarify meaning for terms used in work sections |
150 |
New clause: Clause added to clarify meaning for terms used in work sections |
155 |
New clause: Clause added to clarify meaning for terms used in work sections |
|
|
JCLI 2008 Landscape Maintenance Works Contract (JCLI860A) |
|
A31 PROVISION, CONTENT AND USE OF DOCUMENTS |
|
145 |
New clause: Clause added to clarify meaning for terms used in work sections |
150 |
New clause: Clause added to clarify meaning for terms used in work sections |
155 |
New clause: Clause added to clarify meaning for terms used in work sections |
A34 SECURITY/ SAFETY/ PROTECTION |
|
555 |
New clause. |
|
|
Work sections |
|
|
|
B91 Buildings in the landscape (Update 2010-2.1) |
|
210 |
Clause deleted: Requirements now covered in section B50 or B51 and clause 215. |
215 |
Technical and format revision: |
217 |
New clause: For use where structural design information is provided. To suit introduction of section B50 or B51. Includes for the keeping of production/ execution records. |
220 |
Technical revision: Sub-item regarding structure deleted. Durability of structural elements is now covered by specifying the design working life in clause B50 or B51/120. |
230 |
New clause: Impact resistance of non-loadbearing vertical surfaces. Replaces requirements for impact resistance previously contained in clause 215. |
240 |
New clause: Performance requirements for water penetration resistance. |
480 |
Technical revision: Clause amended. BS EN 12600 added to clause item on impact strength. |
630 |
Technical revision: Heading and clause text amended to include 'buildings'. Consistency throughout section. |
637 |
Technical revision: Item for water penetration deleted. Included in new clause 240. |
910 |
Clause deleted: Requirements now covered in B50 or section B51. |
920 |
Clause deleted: Requirements now covered in B50 or section B51. |
930 |
Technical revision: Sub-item regarding structural design deleted. Requirements now covered in section B50 or B51 and clause 215. |
|
|
E10 Mixing/ Casting/ Curing in situ concrete |
|
817 |
New clause: Curing classes added with reference to new execution code of practice. |
818 |
Technical revision: References to new execution standard to replace withdrawn standard. In accordance with Eurocodes. |
|
|
E20 Formwork for in situ concrete (Update 2010-2.1) |
|
115 |
Clause deleted: Requirements transferred to section B50. |
195 |
Technical revision: Word removed from item. Correct description to match guidance. |
|
|
F30 Accessories/ Sundry items for brick/ block/ stone walling |
|
10 |
Format change: In item ' Insulation' , sub item ' Standard' deleted and British standard reference numbers added to example values. |
12 |
Format change: In item ' Insulation' , sub item ' Standard' deleted and British standard reference numbers added to example values. |
37 |
Format change: ' Studs through sheathing' added to item ' Fixing to timber frame' . To ensure ties are fixed correctly. |
40 |
New clause: To allow the specification of surface mounted channels/ slots. |
88 |
Technical revision: In item ' Core ball test…' , ' BS 646-11' deleted and ' BS EN 15287-1 NA7' added. BS 6461-1 has been superseded by BS EN 15287-1. |
93 |
New clause: To allow specification of concrete flue block system to BS EN 1858. |
|
|
P30 Trenches, pipeways and pits for buried engineering services |
|
475 |
Technical and format revision: Re-written to provide greater flexibility. To improve compatibility with Engineering Services clauses. |
|
|
Q40 Fencing |
|
130 |
Technical revision: Clause amended. Clause item added to allow the specification of finishes to posts and struts. |
140 |
Technical revision: Clause amended. Clause item added to allow the specification of finishes to posts and struts. |
141 |
Technical revision: Clause amended. Clause item added to allow the specification of finishes to posts and struts. |
150 |
Technical revision: Clause amended. Clause item added to allow the specification of finishes to posts and struts. |
151 |
Technical revision: Clause amended. Clause item added to allow the specification of finishes to posts and struts. |
160 |
Technical revision: Clause amended. Clause item added to allow the specification of treatment of finishes to posts. |
165 |
Technical revision: Clause amended. Clause item added to allow the specification of treatment and finishes to posts. |
170 |
Technical revision: Clause amended. Clause item added to allow the specification of finishes to acoustic fencing. |
565 |
Technical revision: Clause amended. Clause item removed. |
715 |
Technical revision: Clause amended. Clause items altered to accommodate the changes to UKAS Sector Scheme certification. |
|
|
Q41 Barriers/ Guardrails (Update 2010-2.1) |
|
110 |
Technical revision: Clause amended. Title change and deletion of clause item for compliance with Eurocodes, and Separation of Fixings and Foundations for clarity. |
117 |
Technical revision: Clause amended. Clause item added to ensure compliance with BS 7818. |
120 |
Technical revision: Clause amended. Deletion of clause item for compliance with Eurocodes. |
125 |
Technical revision: Clause amended. Title change and deletion of clause item for compliance with Eurocodes. |
130 |
Technical revision: Clause amended. Deletion of clause item for compliance with Eurocodes. |
135 |
Technical revision: Clause amended. Clause item for design load removed as this is now specified in clause 300. |
140 |
Technical revision: Clause amended. Title change for clarity. |
150 |
Technical revision: Clause amended. Clause item changed from Finish to Surface finish. |
170 |
Technical revision: Clause amended. Title change for clarity. |
180 |
Technical revision: Clause amended. Title change for clarity. |
190 |
Technical revision: Clause amended. Title change for clarity. |
212 |
Technical revision: Clause amended. Clause item changed from Finish to Surface finish. |
240 |
New clause: Introduced to allow more detailed specification of handrails in compliance with BS 8300. |
300 |
Technical revision: Introduced to allow specification of structural design in compliance with Eurocodes. |
405 |
New clause: Introduced to allow specification of contractor' s competence through the UKAS scheme when installing fencing and railings. |
|
|
Q52 Play and sports equipment |
|
350 |
New clause: Clause created to allow the specification of equestrian equipment. |
355 |
New clause: Clause created to allow the specification of equestrian equipment. |
670 |
New clause: Clause created to allow the specification of equestrian equipment. |
|
|
S17 Water reclamation systems |
|
380 |
Technical revision: Item ' Accessories' deleted. Standard BS EN 14154-2 relates to installation, not accessories. |
|
|
Z10 Purpose made joinery |
|
120 |
Technical revision: Clause amended. BS EN 1313-1:2010 no longer gives reference to NA2 regarding further working of wood section. |

As of November 2008,