NBS Landscape

Update 2010-3

Preliminaries

 

SBCC 2005 Minor Works Building Contract (SBCC356A)

A20 SBCC MINOR WORKS BUILDING CONTRACT (MW/Scot)

Fourth Recital and Schedule Part 2 – BASE DATE
Technical revision: New clause for SBCC Minor Works contract to amend the recital number.

Fifth Recital and Schedule Part 2 – BASE DATE
Clause deleted.

Fourth Recital and Schedule Part 2 – BASE DATE
Clause deleted.

SCHEDULE PART 4: CONTRACT DOCUMENTS
New clause.

A30 TENDERING/ SUBLETTING/ SUPPLY

130

Clause deleted.

596

New clause.

A31 PROVISION, CONTENT AND USE OF DOCUMENTS

145

New clause: Clause added to clarify meaning for terms used in work sections

150

New clause: Clause added to clarify meaning for terms used in work sections

155

New clause: Clause added to clarify meaning for terms used in work sections

660

New clause.

A34 SECURITY/ SAFETY/ PROTECTION

470

New clause.

555

New clause.

 

JCT 2005 Minor Works Building Contract (JCT360A)

A30 TENDERING/ SUBLETTING/ SUPPLY

130

Clause deleted.

596

New clause.

A31 PROVISION, CONTENT AND USE OF DOCUMENTS

145

New clause: Clause added to clarify meaning for terms used in work sections

150

New clause: Clause added to clarify meaning for terms used in work sections

155

New clause: Clause added to clarify meaning for terms used in work sections

660

New clause.

A34 SECURITY/ SAFETY/ PROTECTION

470

New clause.

555

New clause.

 

JCT 2005 Minor Works Building Contract with Contractor's Design (JCT361A)

A30 TENDERING/ SUBLETTING/ SUPPLY

130

Clause deleted.

596

New clause.

A31 PROVISION, CONTENT AND USE OF DOCUMENTS

145

New clause: Clause added to clarify meaning for terms used in work sections

150

New clause: Clause added to clarify meaning for terms used in work sections

155

New clause: Clause added to clarify meaning for terms used in work sections

660

New clause.

A34 SECURITY/ SAFETY/ PROTECTION

470

New clause.

555

New clause.

 

JCLI 2008 Landscape Works Contract (JCLI410A)

A30 TENDERING/ SUBLETTING/ SUPPLY

596

New clause.

A31 PROVISION, CONTENT AND USE OF DOCUMENTS

145

New clause: Clause added to clarify meaning for terms used in work sections

150

New clause: Clause added to clarify meaning for terms used in work sections

155

New clause: Clause added to clarify meaning for terms used in work sections

660

New clause.

A34 SECURITY/ SAFETY/ PROTECTION

470

New clause.

555

New clause.

 

JCLI 2008 Landscape Works Contract with Contractor's Design (JCLI415A)

A30 TENDERING/ SUBLETTING/ SUPPLY

596

New clause.

A31 PROVISION, CONTENT AND USE OF DOCUMENTS

145

Technical revision: Clause added to clarify meaning for terms used in work sections

150

Technical revision: Clause added to clarify meaning for terms used in work sections

155

Technical revision: Clause added to clarify meaning for terms used in work sections

660

New clause.

A34 SECURITY/ SAFETY/ PROTECTION

470

New clause.

555

New clause.

 

ICE Conditions of Contract Minor Works (ICE450A)

A20 ICE MINOR WORKS

clause 3.7 – CONTRACTOR'S DESIGN
New clause.

2 – PAYMENT
New clause.

PARTNERING
New clause.

PARTNERING
New clause: Clause relocated and renumbered from A30/130, to ensure consistency with the schedule of Conditions of Contract.

A30 TENDERING/ SUBLETTING/ SUPPLY

130

Clause deleted.

195

Clause deleted.

596

New clause.

A31 PROVISION, CONTENT AND USE OF DOCUMENTS

145

New clause: Clause added to clarify meaning for terms used in work sections

150

New clause: Clause added to clarify meaning for terms used in work sections

155

New clause: Clause added to clarify meaning for terms used in work sections

660

New clause.

A34 SECURITY/ SAFETY/ PROTECTION

470

New clause.

555

New clause.

 

Short Public Works Contract for Civil Engineering and Building Works Designed by the Employer (IrDoF498A)

A31 PROVISION, CONTENT AND USE OF DOCUMENTS

145

New clause: Clause added to clarify meaning for terms used in work sections

150

New clause: Clause added to clarify meaning for terms used in work sections

155

New clause: Clause added to clarify meaning for terms used in work sections

A34 SECURITY/ SAFETY/ PROTECTION

470

New clause.

555

New clause.

 

JCT Framework Agreement (JCT770A)

A30 TENDERING

596

New clause.

A31 PROVISION, CONTENT AND USE OF DOCUMENTS

145

New clause: Clause added to clarify meaning for terms used in work sections

150

New clause: Clause added to clarify meaning for terms used in work sections

155

New clause: Clause added to clarify meaning for terms used in work sections

 

JCLI 2008 Landscape Maintenance Works Contract (JCLI860A)

A31 PROVISION, CONTENT AND USE OF DOCUMENTS

145

New clause: Clause added to clarify meaning for terms used in work sections

150

New clause: Clause added to clarify meaning for terms used in work sections

155

New clause: Clause added to clarify meaning for terms used in work sections

A34 SECURITY/ SAFETY/ PROTECTION

555

New clause.

 

Work sections

 

B91 Buildings in the landscape (Update 2010-2.1)

210

Clause deleted: Requirements now covered in section B50 or B51 and clause 215.

215

Technical and format revision:
1. Clause amended to Specify contractor's design requirements and responsibilities. To suit introduction of section B51.
2. Items regarding loads and impact removed. Requirements for loads are now covered in clauses B50 or B51/320 to 500 and for impact in new clause 230.

217

New clause: For use where structural design information is provided. To suit introduction of section B50 or B51. Includes for the keeping of production/ execution records.

220

Technical revision: Sub-item regarding structure deleted. Durability of structural elements is now covered by specifying the design working life in clause B50 or B51/120.

230

New clause: Impact resistance of non-loadbearing vertical surfaces. Replaces requirements for impact resistance previously contained in clause 215.

240

New clause: Performance requirements for water penetration resistance.

480

Technical revision: Clause amended. BS EN 12600 added to clause item on impact strength.

630

Technical revision: Heading and clause text amended to include 'buildings'. Consistency throughout section.

637

Technical revision: Item for water penetration deleted. Included in new clause 240.

910

Clause deleted: Requirements now covered in B50 or section B51.

920

Clause deleted: Requirements now covered in B50 or section B51.

930

Technical revision: Sub-item regarding structural design deleted. Requirements now covered in section B50 or B51 and clause 215.

 

E10 Mixing/ Casting/ Curing in situ concrete

817

New clause: Curing classes added with reference to new execution code of practice.

818

Technical revision: References to new execution standard to replace withdrawn standard. In accordance with Eurocodes.

 

E20 Formwork for in situ concrete (Update 2010-2.1)

115

Clause deleted: Requirements transferred to section B50.

195

Technical revision: Word removed from item. Correct description to match guidance.

 

F30 Accessories/ Sundry items for brick/ block/ stone walling

10

Format change: In item ' Insulation' , sub item ' Standard' deleted and British standard reference numbers added to example values.

12

Format change: In item ' Insulation' , sub item ' Standard' deleted and British standard reference numbers added to example values.

37

Format change: ' Studs through sheathing' added to item ' Fixing to timber frame' . To ensure ties are fixed correctly.

40

New clause: To allow the specification of surface mounted channels/ slots.

88

Technical revision: In item ' Core ball test…' , ' BS 646-11' deleted and ' BS EN 15287-1 NA7' added. BS 6461-1 has been superseded by BS EN 15287-1.

93

New clause: To allow specification of concrete flue block system to BS EN 1858.

 

P30 Trenches, pipeways and pits for buried engineering services

475

Technical and format revision: Re-written to provide greater flexibility. To improve compatibility with Engineering Services clauses.

 

Q40 Fencing

130

Technical revision: Clause amended. Clause item added to allow the specification of finishes to posts and struts.

140

Technical revision: Clause amended. Clause item added to allow the specification of finishes to posts and struts.

141

Technical revision: Clause amended. Clause item added to allow the specification of finishes to posts and struts.

150

Technical revision: Clause amended. Clause item added to allow the specification of finishes to posts and struts.

151

Technical revision: Clause amended. Clause item added to allow the specification of finishes to posts and struts.

160

Technical revision: Clause amended. Clause item added to allow the specification of treatment of finishes to posts.

165

Technical revision: Clause amended. Clause item added to allow the specification of treatment and finishes to posts.

170

Technical revision: Clause amended. Clause item added to allow the specification of finishes to acoustic fencing.

565

Technical revision: Clause amended. Clause item removed.

715

Technical revision: Clause amended. Clause items altered to accommodate the changes to UKAS Sector Scheme certification.

 

Q41 Barriers/ Guardrails (Update 2010-2.1)

110

Technical revision: Clause amended. Title change and deletion of clause item for compliance with Eurocodes, and Separation of Fixings and Foundations for clarity.

117

Technical revision: Clause amended. Clause item added to ensure compliance with BS 7818.

120

Technical revision: Clause amended. Deletion of clause item for compliance with Eurocodes.

125

Technical revision: Clause amended. Title change and deletion of clause item for compliance with Eurocodes.

130

Technical revision: Clause amended. Deletion of clause item for compliance with Eurocodes.

135

Technical revision: Clause amended. Clause item for design load removed as this is now specified in clause 300.

140

Technical revision: Clause amended. Title change for clarity.

150

Technical revision: Clause amended. Clause item changed from Finish to Surface finish.

170

Technical revision: Clause amended. Title change for clarity.

180

Technical revision: Clause amended. Title change for clarity.

190

Technical revision: Clause amended. Title change for clarity.

212

Technical revision: Clause amended. Clause item changed from Finish to Surface finish.

240

New clause: Introduced to allow more detailed specification of handrails in compliance with BS 8300.

300

Technical revision: Introduced to allow specification of structural design in compliance with Eurocodes.

405

New clause: Introduced to allow specification of contractor' s competence through the UKAS scheme when installing fencing and railings.

 

Q52 Play and sports equipment

350

New clause: Clause created to allow the specification of equestrian equipment.

355

New clause: Clause created to allow the specification of equestrian equipment.

670

New clause: Clause created to allow the specification of equestrian equipment.

 

S17 Water reclamation systems

380

Technical revision: Item ' Accessories' deleted. Standard BS EN 14154-2 relates to installation, not accessories.

 

Z10 Purpose made joinery

120

Technical revision: Clause amended. BS EN 1313-1:2010 no longer gives reference to NA2 regarding further working of wood section.