Welcome to NBS

NBS Scheduler

JCT 2011 Contracts

From 1 October in England and Wales and 1 November in Scotland all building contracts signed must comply with the Local Democracy, Economic Development and Construction Act. To ensure you are up-to-date and complying with this change, NBS have included four newly published JCT contracts in this update, which comply with the legislation and avoid the provisions of the Scheme for Construction Contracts 2011 applying in default. Additional information may be found in our JCT 2011 contracts article.

Update 2011-3

The list that follows highlights work sections in NBS Scheduler Update 2011-3 which have undergone technical revisions.

If you have any questions, please contact our Software Support department on 0845 456 9594.

New Contracts

A20/336 JCT 2011 Intermediate Building Contract (Scheduler) (Update 2011-2.1)

A20/337 JCT 2011 Intermediate Building Contract with Contractor’s Design (Scheduler) (Update 2011-2.1)

A20/372 JCT 2011 Minor Works Building Contract (Scheduler) (Update 2011-2.1)

A20/373 JCT 2011 Minor Works Building Contract with Contractor’s Design (Scheduler) (Update 2011-2.1)

A20/770 JCT Framework Agreement (Update 2011-2.1)

Removed Contracts

A20/498 Short Public Works Contract for Civil Engineering and Building Works Designed by the Employer (Update 2011-2.1)

Work Sections

G12 Isolated structural metal members

J31 Liquid applied waterproof roof coatings

J41 Reinforced bitumen membrane roof coverings

N15 Signs and notices

P12 Fire stopping systems

P20 Unframed isolated trims skirtings and sundry items

P30 Trenches pipeways and pits for buried engineering services and gas venting

Q22 Asphalt pavings

Q23 Gravel, hoggin and woodchip drives and pavings

Q24 Interlocking brick or block roads or pavings

Q25 Slab, brick, sett or cobble pavings

T90 Heating systems

BackToTop

Login

Click here to register

Contact NBS

Call us:
0845 456 9594
 

Email us:
support@theNBS.com

Email Updates

Receive regular email
updates from NBS