Welcome to NBS |
NBS solutions|
Products and services for all construction projects
NBS Scheduler
JCT 2011 Contracts
From 1 October in England and Wales and 1 November in Scotland all building contracts signed must comply with the Local Democracy, Economic Development and Construction Act. To ensure you are up-to-date and complying with this change, NBS have included four newly published JCT contracts in this update, which comply with the legislation and avoid the provisions of the Scheme for Construction Contracts 2011 applying in default. Additional information may be found in our JCT 2011 contracts article.
Update 2011-3
The list that follows highlights work sections in NBS Scheduler Update 2011-3 which have undergone technical revisions.
If you have any questions, please contact our Software Support department on 0845 456 9594.
New Contracts
A20/336 JCT 2011 Intermediate Building Contract (Scheduler) (Update 2011-2.1)
A20/337 JCT 2011 Intermediate Building Contract with Contractor’s Design (Scheduler) (Update 2011-2.1)
A20/372 JCT 2011 Minor Works Building Contract (Scheduler) (Update 2011-2.1)
A20/373 JCT 2011 Minor Works Building Contract with Contractor’s Design (Scheduler) (Update 2011-2.1)
A20/770 JCT Framework Agreement (Update 2011-2.1)
Removed Contracts
A20/498 Short Public Works Contract for Civil Engineering and Building Works Designed by the Employer (Update 2011-2.1)
Work Sections
G12 Isolated structural metal members
J31 Liquid applied waterproof roof coatings
J41 Reinforced bitumen membrane roof coverings
N15 Signs and notices
P12 Fire stopping systems
P20 Unframed isolated trims skirtings and sundry items
P30 Trenches pipeways and pits for buried engineering services and gas venting
Q22 Asphalt pavings
Q23 Gravel, hoggin and woodchip drives and pavings
Q24 Interlocking brick or block roads or pavings
Q25 Slab, brick, sett or cobble pavings
T90 Heating systems

As of November 2008,