The list that follows highlights work sections in NBS Scheduler Update which have undergone technical revisions.
Following the introduction of the Construction (Design and Management) Regulations 2015 on April 6, JCT has issued amendments to their contracts. Updated preliminaries were included in your 2015-2 July update. Preliminaries for ICC Minor Works Version, Amendment ICC/CDM/May2015, are also now included.
If you have any questions, please contact our Software Support department on 0345 456 9594.
Prelims
A20/456 – Infrastructure Conditions of Contract (ICC) Minor Works Version
A20/775 – SBCC Framework Agreement (new)
Work sections
E10 – In situ concrete (Update 2015-2.1)
H32 – Plastics profiled sheet cladding and covering (Update 2015-2.1)
J21 – Mastic asphalt roofing insulation and finishes
J31 – Liquid applied waterproof roof coatings
J41 – Reinforced bitumen membrane roof coverings (Update 2015-2.1)
J42 – Single layer polymeric sheet roof coverings (Update 2015-2.1)
K10 – Plasterboard dry linings for walls partitions and ceilings (Update 2015-2.1)
K11 – Rigid sheet flooring, sheathing, decking, sarking, linings and casings (Update 2015-2.1)
M10 – Cement based levelling and wearing screeds (Update 2015-2.1)
M20a – Plastered coatings (Update 2015-2.1)
M20b – Rendered and roughcast coatings (Update 2015-2.1)
N13 – Sanitary appliances and fittings (Update 2015-2.1)
R12 – Below ground drainage systems (Update 2015-2.1)
R16 – Groundwater pressure relief drainage systems (Update 2015-2.1)
S90 – Hot and cold water supply systems (Update 2015-2.1)
W44 – Closed circuit television systems