Click here to find out how to access this document
External wall insulation pre-installation building inspection check list
Publication Year
2017
Document Status
Current
Abstract
Check list for the building survey and the EEM design prior to installation; covering detail and condition of property, existing finishes, structural defects, existing render, presence of damp, frost damage, detail and location of movement joints, moss/lichen/mould or efflorescence, heating system, existing ventilation, windows/door material, external services/attachments to the walls, external electrical cables/equipment, abutment to eaves, roofs and other structures, rainwater and drainage pipes, dpcs, architectural features and suitability for EWI.
Document History
Version 1.0 31/03/2017. Also known as: Standard insulation sector check list.
Publisher Information
Insulated Render and Cladding Association
The Insulated Render and Cladding Association is the trade association for the external wall insulation industry in the UK and Europe, representing the system designers, specialist installers and component suppliers.
Unit 7
Willow Industrial Park
Willow Road
Castle Donington
INCA
UK
Website: http://www.inca-ltd.org.uk
Email: info@inca-ltd.org.uk
Tel: +44 (0)330 1246585