Click here to find out how to access this document
Report HC 49-II Grenfell Tower Inquiry: Phase 1 report. Report of the public inquiry into the fire at Grenfell Tower on 14 June 2017. Volume 2
Publication Year
2019
Document Status
Current
Abstract
Presents the Phase 1 report from the Grenfell Tower Inquiry, comprising 4 volumes looking at the background factors, the events of 14 June 2017, and conclusions and recommendations. Also remembers those who died and what to expect from Phase 2 of the Inquiry.
Document History
Volume 2 of 4. Issued: October 2019. Chairman: The Rt Hon Sir Martin Moore-Bick. Presented to Parliament pursuant to section 26 of the Inquiries Act 2005 ordered by the House of Commons to be printed 30 October 2019. This report contains images and content which some may find distressing.
ISBN
9781528616027
Publisher Information
Grenfell Tower Inquiry
The Inquiry was established by the Prime Minister to investigate the circumstances leading up to and surrounding the Grenfell Tower fire on 14 June 2017. Chaired by Sir Martin Moore-Bick, the terms of reference were set following public consultation. The list of issues have been separated into two phases: Phase 1 looks at the factual narrative of the events on 14/06/2017, with the hearings taking place between 21/05/2018-12/12/2018 and a final report issued October 2019. Phase 2 covers the remaining issues, with the hearings starting early 2020 and a final report to be subsequently published.
13 Bishop's Bridge Road
London
GTI
UK
Website: www.grenfelltowerinquiry.org.uk
Email: contact@grenfelltowerinquiry.org.uk
Tel: 0800 121 4282