Last year, the Institution of Civil Engineers officially endorsed the New Engineering Contract for all construction work in the UK and overseas.
ICE decided to recommend the NEC3 suite of contracts in preference to its own, long established Conditions of Contract. Since the first edition was published in 1993, NEC has been used for many high profile construction projects such as Crossrail and London 2012.
This programme takes a look at how the NEC3 Engineering and Construction Contract, and in particular its programme, can help site teams achieve higher levels of success.
About the contributor
Dr Jon Broome gained his original PhD through research into the NEC. He is also chair of the Association for Project Management's Contracts and Procurement Special Interest Group and managing consultant of Leading Edge Projects Consulting Ltd.
Disclaimer: NBS TV programmes are the intellectual property of RIBA Enterprises and it shall be a breach of this right to copy, or in any way exploit commercially or show in public any of the programmes without the express permission of RIBA Enterprises.
The information contained in the programmes is not intended and accordingly shall not be relied upon either as a substitute for professional advice or judgement or to provide legal or other advice with respect to any particular circumstance. RIBA Enterprises accepts no responsibility for loss occasioned to any person acting or refraining from action as a result of the information contained in the programmes.
Visqueen launches Ultimate Self Adhesive Membrane for hydrocarbon and VOC-contaminated sites
The construction industry faces growing challenges when building on increasingly complex brownfield sites. Alongside the need for effective waterproofing, developers and contractors must now address a wider range of ground contaminants, including hydrocarbons, volatile organic compounds (VOCs), and hazardous ground gases, while maintaining programme efficiency and installation quality. Against this backdrop, Visqueen has expanded its gas protection and waterproofing portfolio with the launch of Visqueen Ultimate Self Adhesive Membrane, a new hydrocarbon and VOC-resistant self-adhesive tanking membrane. Developed as the latest addition to the Visqueen non-foil gas barrier range, the new membrane combines proven gas barrier and waterproofing performance to help specifiers address multiple site challenges with a single solution.
Construction ProductsSponsored
Siderise: Helping to bridge the gap between Gateway 2 approval and on-site fire protection
While the new building safety regime hasn’t fundamentally changed what requirements higher-risk buildings (HRBs) must meet to comply with the Building Regulations, it has significantly increased the breadth, depth and volume of evidence that must be supplied to demonstrate this. As a result, project teams have had to adapt the way they work and even look beyond their roles to understand how their actions may impact the next Dutyholder in the chain. For specifiers, this can include considering what supporting services are offered with life safety-critical elements to enable correct design, installation and maintenance. Early engagement with manufacturer technical specialists can help identify any practical challenges that may arise onsite. Then, during construction, these services can help support the translation of design intent into reality so that buildings are safe for occupation.