Retrofit - meeting 2050 carbon targets

Dec 7, 2011 |NBS

The Technology Strategy Board’s (TSB) Retrofit for the Future scheme is a £17m trial to see how the UK housing stock can be overhauled to help meet the Government’s target of reducing CO2 emissions by 80 per cent by 2050.

In this programme we look at two very different properties that have been retrofitted as part of the TSB trial: a London terrace house, and a modern semi-detached property in Crawley, Sussex.

Key Learning:

  • The rationale behind the TSB Retrofit for the Future programme
  • The problem with our existing housing regarding CO2 emissions
  • Insulation methodologies; both internal and external
  • Mechanical Ventilation and Heat Recovery units explained
  • What is the cost and payback time of retrofit schemes?

About the contributors

Marion Baeli
Paul Davis + Partners retrofit expert and project architect for 100 Princedale Road.

Hannah Thompson
Project manager of 100 Princedale Road for social housing firm Octavia Housing.

Ruairi Kay
Retrofit expert and project lead on the complete overhaul and retrofit of 22 Hastings Road, Crawley, Sussex.

RIBA CPDDisclaimer: NBS TV programmes are the intellectual property of RIBA Enterprises and it shall be a breach of this right to copy, or in any way exploit commercially or show in public any of the programmes without the express permission of RIBA Enterprises.
The information contained in the programmes is not intended and accordingly shall not be relied upon either as a substitute for professional advice or judgement or to provide legal or other advice with respect to any particular circumstance. RIBA Enterprises accepts no responsibility for loss occasioned to any person acting or refraining from action as a result of the information contained in the programmes.
 

Our latest articles

Visqueen launches Ultimate Self Adhesive Membrane for hydrocarbon and VOC-contaminated sites

The construction industry faces growing challenges when building on increasingly complex brownfield sites. Alongside the need for effective waterproofing, developers and contractors must now address a wider range of ground contaminants, including hydrocarbons, volatile organic compounds (VOCs), and hazardous ground gases, while maintaining programme efficiency and installation quality. Against this backdrop, Visqueen has expanded its gas protection and waterproofing portfolio with the launch of Visqueen Ultimate Self Adhesive Membrane, a new hydrocarbon and VOC-resistant self-adhesive tanking membrane. Developed as the latest addition to the Visqueen non-foil gas barrier range, the new membrane combines proven gas barrier and waterproofing performance to help specifiers address multiple site challenges with a single solution.

Construction ProductsSponsored

Siderise: Helping to bridge the gap between Gateway 2 approval and on-site fire protection

While the new building safety regime hasn’t fundamentally changed what requirements higher-risk buildings (HRBs) must meet to comply with the Building Regulations, it has significantly increased the breadth, depth and volume of evidence that must be supplied to demonstrate this. As a result, project teams have had to adapt the way they work and even look beyond their roles to understand how their actions may impact the next Dutyholder in the chain. For specifiers, this can include considering what supporting services are offered with life safety-critical elements to enable correct design, installation and maintenance. Early engagement with manufacturer technical specialists can help identify any practical challenges that may arise onsite. Then, during construction, these services can help support the translation of design intent into reality so that buildings are safe for occupation.

Construction ProductsSponsored

RIBA CPD for Architects: Understanding Flooring Specification and Detailing

For architects and specifiers, flooring details can have a significant impact on the safety, accessibility, durability and overall performance of a building. Yet the technical considerations surrounding stairways, floor transitions, and floor finishes are not always straightforward.

RIBA CPDSponsored