This is the latest in our quarterly updating programme for Uniclass. It includes updates to nine tables, and is predominantly for the addition of new classifications and corrections to existing classifications.

We aim to minimize changes to existing codes and classifications, but we always take feedback from users into account. Any changes are the result of this input, combined with our own ongoing review.

Updates to existing tables

In this update, we have included some new codes for dams in the ‘Complexes’, ‘Entities’ and ‘Spaces/ locations’ tables. This follows a request from a user and consultation with the Uniclass Advisory Board and other users such as the Environment Agency.

Our consultation with the Water Industry Classification Hierarchy Standards (WICHS) group has now allowed us to add new codes to the ‘Complexes’, ‘Entities’ and ‘Elements/ functions’ tables, and further new Systems codes will follow in the next update in October.

We have been working with some tunnel experts and National Highways to add new codes for the excavation, construction and management of tunnels. These are included in the ‘Entities’, ‘Activities’, ‘Elements/ functions’, ‘Systems’ and ‘Products’ tables.

Additional changes have been made in the tables following feedback from users, including: amendments to the survey classifications in the ‘Activities’ table; codes to match the requirements for Passivhaus in the ‘Project Management’ table; new codes for bridges in the ‘Systems’ table and codes for equipment used in crematoriums in the ‘Products’ table. Full details of these changes are detailed in the revisions sheets and the Excel change log.

Download the tables

 

Continuing input and feedback

Between updates, we liaise regularly with a growing number of individuals and organizations that use the tables in order to provide support, and to evaluate requests for new codes. We are grateful to all of the organizations that we have worked with for their input. As we share details of this activity, industry professionals can learn more about who else is using the tables, what purposes they are using them for, the range of changes to expect and the reasons for those changes.

The work of maintaining and enhancing Uniclass to continually support the needs of those operating in the built environment is an ongoing exercise. We welcome comment and input from all sectors in the construction industry via the new feeback page.

Changes to published versions

Status and revision information is available alongside each Uniclass table. Each information sheet (PDF) provides a summary of the changes made, as well as code-by-code details. A full list of all changes is also available in the Excel change log.

The text of this page is available for modification and reuse under the terms of the Creative Commons Attribution-Sharealike 3.0 Unported License and the GNU Free Documentation License (unversioned, with no invariant sections, front-cover texts, or back-cover texts).

Our latest articles

Visqueen launches Ultimate Self Adhesive Membrane for hydrocarbon and VOC-contaminated sites

The construction industry faces growing challenges when building on increasingly complex brownfield sites. Alongside the need for effective waterproofing, developers and contractors must now address a wider range of ground contaminants, including hydrocarbons, volatile organic compounds (VOCs), and hazardous ground gases, while maintaining programme efficiency and installation quality. Against this backdrop, Visqueen has expanded its gas protection and waterproofing portfolio with the launch of Visqueen Ultimate Self Adhesive Membrane, a new hydrocarbon and VOC-resistant self-adhesive tanking membrane. Developed as the latest addition to the Visqueen non-foil gas barrier range, the new membrane combines proven gas barrier and waterproofing performance to help specifiers address multiple site challenges with a single solution.

Construction ProductsSponsored

Siderise: Helping to bridge the gap between Gateway 2 approval and on-site fire protection

While the new building safety regime hasn’t fundamentally changed what requirements higher-risk buildings (HRBs) must meet to comply with the Building Regulations, it has significantly increased the breadth, depth and volume of evidence that must be supplied to demonstrate this. As a result, project teams have had to adapt the way they work and even look beyond their roles to understand how their actions may impact the next Dutyholder in the chain. For specifiers, this can include considering what supporting services are offered with life safety-critical elements to enable correct design, installation and maintenance. Early engagement with manufacturer technical specialists can help identify any practical challenges that may arise onsite. Then, during construction, these services can help support the translation of design intent into reality so that buildings are safe for occupation.

Construction ProductsSponsored

RIBA CPD for Architects: Understanding Flooring Specification and Detailing

For architects and specifiers, flooring details can have a significant impact on the safety, accessibility, durability and overall performance of a building. Yet the technical considerations surrounding stairways, floor transitions, and floor finishes are not always straightforward.

RIBA CPDSponsored