Market House is a Grade II* listed civic building, often called the “jewel in the crown” of St. Austell. Despite its status, years without insulation left it in decline. See how Cornerstone used technology to assess thermal performance and inform future thermal upgrades in solid-walled buildings in the Southwest.

 

A first step for the town hall

With Cornwall Council’s long-term vision for Market House defined, the first priority was to improve the thermal performance of the large first-floor assembly room, the former town hall. 

As a pilot project, this was the first thermal upgrade and an opportunity to gather data to inform future projects on historic buildings across the Southwest.

 

The challenge

Improving thermal performance meant tackling significant heat loss through the building’s solid, uninsulated walls. Granite’s high thermal conductivity and long periods without heating left the space cold, damp and in decline.

With large arched windows and high ceilings, the space had striking character, but the walls and window reveals contributed to significant heat loss.

With conventional internal or external insulation not feasible, any intervention needed to be compatible with the building's fabric, preserve architectural details, and avoid trapped moisture and condensation. A breathable insulating plaster was the ideal solution to improve thermal performance of the solid walls and reduce thermal bridging at window reveals, without compromising the fabric or appearance.

 

The solution

Working closely with Cornwall Council, the existing internal plaster, skirting boards, and surrounding ceilings were removed to prepare the space for SuperTherm.

Cornerstone’s most insulating lime plaster, SuperTherm has a K-value of 0.04 and would function as a thermal layer and basecoat, improving insulation while remaining highly vapour-permeable to manage moisture effectively.

Applied by spray and hand methods, the Natural Plastering Company applied 35mm of SuperTherm to the main walls, and 25-80mm within the window reveals. Once the base layer was complete and damp cured for seven days, a 6mm layer of SuperTherm Finishing Plaster was applied. 

cornerstone-advertorial-26-04-1

Performance testing and thermal imaging 

Throughout the 15-month project period, independent performance monitoring was implemented pre- and post-application. The Elemental Cube™ was deployed to ensure accurate testing throughout the project, creating a one cubic meter of temperature-controlled space both internally and externally to the building.

Heat flux sensors and GreenTEG U-value kits were also used to obtain an average U-value for each wall section and to identify any inaccurate U-values to discard.

To ensure that each location tested had an accurate representation of the specific orientation and wall construction, a thermal camera was used. The camera analysed heat transmission through the façade to identify anomalies that may cause inaccurate data, such as thermal bridging, cold spots, or inconsistent insulation.

Thermographic inspection showed orange areas with high heat transfer, while light blue indicated lower transfer.

cornerstone-advertorial-26-04-2

The results

For the main external wall, the initial application of SuperTherm improved the U-value from an average of 2.18 W/m²K to 1.07 W/m²K, an average improvement of 68.3% compared to the uninsulated solid stone wall. Once cured, the U-value improved further to 0.74 W/m²K, demonstrating continued performance gains from carbonation over time.

Before the works, the U-value of the window reveals was about 38.5% higher than that of the main external wall, indicating significant heat loss despite their proportionally smaller area.

After the initial application, the window's U-value improved from an average of 3.22 W/m²K to 1.06 W/m²K, an average improvement of 67.1%. Once cured, performance improved further to 0.81 W/m²K, an additional 23.6% improvement in thermal performance.

cornerstone-advertorial-26-04-3

“Using The Elemental Cube™, we measured a 74.8% improvement in thermal performance with SuperTherm, resulting in a dramatic reduction in heat loss through solid stone walls, while maintaining compatibility and breathability. That's the kind of results that really make a difference to how a building feels to live or work in.”

Jason Ratcliffe, The Wellbeing Surveyor in Partnership with Cornwall Council 

SuperTherm and SuperTherm Finishing Plaster will continue to carbonate over time, with further monitoring planned for Summer 2026. This pilot project showed how SuperTherm can improve thermal performance in solid-walled heritage buildings without compromising historic building fabric.

Learn more about the pilot project and independent testing with the Cornwall Council SAMH Insulating Plaster Report.

For more information, visit www.cornerstonemortars.co.uk or contact us at info@cornerstonemortars.co.uk.

 

Our latest news

Visqueen supports one of the first Gateway 2 approvals under the Building Safety Act

The Dyecoats development in Leeds marks a major milestone for the UK housing sector. The £100 million flagship Latimer Homes scheme being delivered by GRAHAM is one of the first high-rise new-build projects in the country to achieve Building Safety Act Gateway 2 approval, a crucial pre-construction sign-off confirming that the design meets all safety and regulatory requirements before work begins on site.

Building Safety ActSponsored

Five questions to ask when specifying insulated panels

Selecting an insulated panel system for an industrial building should start with the building and application requirements.

Design and SpecificationSponsored

NBS and BDP join forces to improve generic carbon data in construction

Today, NBS (part of Hubexo), the platform for connected construction information, announces a long-term strategic partnership with BDP, a major global multidisciplinary practice of architects, designers, engineers and urbanists. The partnership recognises BDP's integral role in the development of NBS LCA, a new life-cycle carbon assessment platform providing professionals with high-quality, reliable and easy-to-use carbon data to ensure accurate tracking as construction projects evolve. BDP's primary contribution to NBS LCA has been the development of more than 1,300 pre-calculated generic assemblies, covering the most commonly used building fabric elements alongside key concrete and steel structural elements. These assemblies provide whole-element carbon data, giving designers consistent, UK-relevant carbon benchmarks from the earliest stages of project design. Users can easily and instantly apply carbon rates to a range of pre-configured common building elements, including walls, floors, and roofs. Developed by BDP and NBS, the assemblies remove the need for designers to manually build up material layers or calculate individual components at the concept stage. This saves significant time and effort, enabling proportionate and responsible carbon evaluation early in the design process, when decisions have the greatest impact on a project's overall carbon footprint. BDP also participated in collaborative workshops that directly informed the development of NBS LCA, helping to shape a tool that is practical, accessible and aligned with real-world UK construction workflows. Dr Lee Jones, Head of Sustainability at Hubexo, said: “BDP's contribution to NBS LCA has been invaluable. Their depth of project experience and technical knowledge has directly shaped the generic assemblies at the heart of the platform. These assemblies give designers a reliable, UK-relevant starting point for carbon assessment, without the burden of building everything from scratch. This is exactly the kind of collaboration that moves the industry forward, and we're proud to be working with BDP on a long-term basis.” Julia Yao, Associate, Sustainability Consultant at BDP, said: “Carbon assessment needs to be embedded in design from day one, not bolted on at the end. Working with NBS to develop its LCA product has been a genuine opportunity to put that principle into practice. The generic assemblies we developed draw on real project data and are designed to give designers meaningful, actionable carbon information at the concept stage. We're delighted to see them at the core of a platform that will be used across the industry.” With the UK Government outlining its commitment to responsible carbon reporting through its Carbon Budget and Growth Delivery Plan, professionals need reliable, easy-to-use tools to assess and report embodied carbon. NBS LCA addresses this need by integrating carbon calculations with live design work, drawing on structured data from Circular Ecology's ICE Database and more than 12,500 verified, specification-ready construction products with Environmental Product Declarations (EPDs) from NBS Source and ECO Portal. Over the coming months, NBS and BDP will continue to develop their partnership, with a shared commitment to improving the quality and accessibility of carbon data for construction professionals across the UK. NBS LCA is available now, with flexible subscriptions designed for all professionals. For more information, visit the website here.

Product update