Supplementary schedule for contractor's design services (SupCD-07) (pack): Contractor's design services - notes on use and completion (Notes-CD-07) (Superseded by 2010 version)
Publication Year
2007
Document Status
Withdrawn
Abstract
Suitable for use where an architect/consultant is required to prepare a design for a development project or a building project procured under the JCT standard form of building contract with contractor's design (JCT DB 05).
Document History
Replaced by Contractor's design services notes Parts 1-4 which is only available as an electronic component of RIBA Agreements 2010. Replaces Contractors proposals. Amendment DB2/99 where the client is a contractor (RIBA form of agreement for the appointment of an architect SFA/99). The Supplementary schedule for contractor's design services (SupCD-07) pack comprises of: SS-CD-07 - Contractor's design services. Notes-CD-07 - Contractor's design services: notes on use and completion.
Publisher Information
RIBA Publishing
RIBA Publishing produce best practice, legal, management and technical design guides for architects and other built environments professionals.