
Specification 336.1-24 Construction of drilled piers - Specification
Publication Year
2024
Document Status
Current
Abstract
Requirements for drilled pier construction (also known as drilled shafts, drilled caissons, drilled piers with bells, drilled shafts with bells, or bored pile) including excavation; use of liners and casing; drilling slurry and concrete free-fall placement methods; testing; reinforcement fabrication; quality control and assurance; and acceptance.
Document History
Supersedes ACI SPEC 336.1-01.
Publisher Information
American Concrete Institute
Founded in 1904, the American Concrete Institute supports the development, dissemination, and adoption of its consensus-based standards, technical resources, certification and training in concrete design, construction and materials.
CCI Headquarters
38800 Country Club Drive
Farmington Hills
ACI
USA
Website: www.concrete.org
Email: BKStore@concrete.org
Tel: +1 248 848-3700