Click here to find out how to access this document
Report R 85C Target and cost-reimbursable construction contracts - Part C: Preparation of contract conditions (relating to the ICE conditions - 5th edition)
Publication Year
1982
Document Status
Current
Abstract
A study of the use of target and cost-reimbursable contracts giving advantages and disadvantages. Part C examines the considerations of preparing contracts and looks at the clauses for actual cost and fee.
Document History
Formerly report 56, R 85 is split into 3 parts A-C.
Publisher Information
CIRIA
CIRIA was formerly known as the Construction Industry Research and Information Association. They are a member-based research and information organisation who publish reports and technical papers covering building and civil engineering as well as transport and utilities infrastructure.
Griffin Court
15 Long Lane
London
CIRIA
UK
Website: http://www.ciria.org
Email: enquiries@ciria.org
Tel: 020 7549 3300