Series details
|
Title
|
Year
|
Status
|
Guidance Notes: Plant and Machinery (PM) PM 24
|
Safety at rack and pinion hoists
|
1981
|
Withdrawn
|
Guidance Notes: Plant and Machinery (PM) PM 25
|
Vehicle finishing units: fire and explosion hazards (Withdrawn)
|
1987
|
Withdrawn, cited in regs
|
Guidance Notes: Plant and Machinery (PM) PM 28
|
Working platforms (non-integrated) on forklift trucks. 3rd edition
|
2005
|
Withdrawn
|
Guidance Notes: Plant and Machinery (PM) PM 28
|
Working platforms on forklift trucks. 2nd edition
|
2000
|
Withdrawn
|
Guidance Notes: Plant and Machinery (PM) PM 55
|
Safe working with travelling overhead cranes (1990 reprint)
|
1985
|
Withdrawn
|
Guidance Notes: Plant and Machinery (PM) PM 60
|
Steam boiler blowdown systems. 2nd edition
|
1998
|
Withdrawn
|
Guidance Notes: Plant and Machinery (PM) PM 63
|
Inclined hoists used in building and construction work
|
1987
|
Withdrawn
|
Guidance Notes: Plant and Machinery (PM) PM 75
|
Glass reinforced plastic vessels and tanks: advice to users. 3rd edition
|
2010
|
Current
|
Guidance Notes: Plant and Machinery (PM) PM 75
|
Glass reinforced plastic vessels and tanks
|
1991
|
Withdrawn
|
Guidance Notes: Plant and Machinery (PM) PM 78
|
Safety at passenger carrying aerial ropeways
|
1994
|
Withdrawn
|
Guidance Notes: Plant and Machinery (PM) PM 79
|
Power presses: thorough testing and examination
|
1995
|
Withdrawn
|
Guidance Notes: Plant and Machinery (PM) PM 82
|
Selection, installation and maintenance of electrical equipment for use in and around buildings containing explosives
|
1997
|
Withdrawn
|
Guidance Notes: Plant and Machinery (PM) PM 84
|
Control of safety risks at gas turbines used for power generation. 2nd edition
|
2003
|
Withdrawn
|
Guidance Notes: Plant and Machinery (PM) PM 84
|
Control of safety risks at gas turbines used for power generation
|
2000
|
Withdrawn
|
Contract Research Report 42/1992
|
Sick building syndrome: a review of the evidence on causes and solutions
|
1992
|
Withdrawn
|
Contract Research Report 51/1993
|
Improving safety on construction sites by changing personnel behaviour
|
1993
|
Archived
|
Contract Research Report 71/1995
|
Construction (design and management) regulations 1994. Brief for a designers' handbook
|
1995
|
Withdrawn
|
Contract Research Report 72/1995
|
Information on site safety for designers of smaller building projects
|
1995
|
Withdrawn
|
Contract Research Report 73/1995
|
Dust and noise in the construction process
|
1995
|
Archived
|
Contract Research Report 92/1996
|
Post construction audit of sprayed concrete tunnel linings
|
1996
|
Archived
|