Other tools NBS offers a range of tools for specification and collaboration National BIM Library The most trusted BIM Library in the UK, certified to the internationally-recognised NBS BIM Object Standard Uniclass 2015 A dynamic and unified classification system for the construction industry covering all sectors Construction Information Service (CIS) A comprehensive online collection of construction related standards, regulations, technical advice and articles Plug-ins NBS provides a range of tools to help connect your CAD model to your specification model
Platform Resources Support Events About TheNBS.com Manufacturers Uniclass 2015 Get in touch

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom

Platform

NBS Chorus Features and pricing Book a demonstration Sign in to NBS Chorus Other tools National BIM Library Uniclass 2015 Construction Information Service (CIS) Plug-ins

Resources

Knowledge Sample Specification Case studies Authors

Support

Training Downloads and updates

About

About NBS Newsroom

Sweet and Maxwell

Sweet and Maxwell are a large commercial Publisher for the legal and regulatory markets. In May 2005 they took over the publishing of the JCT contracts.

100 Avenue Road
London
SMA
UK

Documents by this publisher

Page 14 of 20

Series details Title Year Status
JCT Repair and Maintenance Contract (RM) RM JCT repair and maintenance contract - commercial. Revision 1 2007 (Replaced by Revision 2 2009) 2007 Withdrawn
JCT Measured Term Contract (MTC) MTC/G JCT measured term contract: guide 2016 2016 Current
JCT Measured Term Contract (MTC) MTC JCT measured term contract 2016 2016 Current
JCT Measured Term Contract (MTC) MTC/G JCT measured term contract: guide (2011) 2011 Withdrawn
JCT Measured Term Contract (MTC) MTC JCT measured term contract 2011 (Withdrawn) 2011 Withdrawn
JCT Measured Term Contract (MTC) MTC Amendment 1 issued March 2015 (effective from 6 April 2015): JCT measured term contract 2011 (Withdrawn) 2015 Withdrawn
JCT Measured Term Contract (MTC) MTC/G JCT measured term contract: guide. Revision 2009 2009 Withdrawn
JCT Measured Term Contract (MTC) MTC JCT measured term contract. Revision 2 2009 2009 Withdrawn
JCT Measured Term Contract (MTC) MTC/G JCT measured term contract: guide (Replaced by Revision 2009) 2006 Withdrawn
JCT Measured Term Contract (MTC) MTC JCT measured term contract. Revision 1 2007 (please refer to the attestation update, also available through The Construction Information Service) (Replaced by Revision 2 2009) 2007 Withdrawn
JCT Measured Term Contract (MTC) MTC JCT measured term contract: agreement and conditions (includes Amendment 1) 2006 Withdrawn
JCT Framework Agreement (FA) FA/G JCT framework agreement - guide 2016 2016 Current
JCT Framework Agreement (FA) FA JCT framework agreement 2016 2016 Current
JCT Framework Agreement (FA) FA/G JCT framework agreement - guide (2011) 2011 Withdrawn
JCT Framework Agreement (FA) FA JCT framework agreement 2011 (Withdrawn) 2011 Withdrawn
JCT Framework Agreement (FA) FA/G JCT framework agreement - guide 2007 Withdrawn
JCT Framework Agreement (FA) FA JCT framework agreement (please refer to the attestation update, also available through The Construction Information Service) 2007 Withdrawn
JCT Framework Agreement (FA) FA/G JCT framework agreement - guide 2005 Withdrawn
JCT Framework Agreement (FA) FA/N JCT framework agreement: non binding 2005 Withdrawn
JCT Framework Agreement (FA) FA JCT framework agreement 2005 Withdrawn

Page 14 of 20