A wide range of interesting articles that help you make informed decisions and deliver the best projects for your clients authored by our team of NBS subject specialists and construction industry contributors.
Sustainability
Sustainable Futures UK Report 2026
Explore the current state of sustainability in the UK construction industry based on the results from a comprehensive survey conducted by NBS.
Must Reads
RIBA CPD
RIBA CPD for Architects: Understanding Flooring Specification and Detailing
For architects and specifiers, flooring details can have a significant impact on the safety, accessibility, durability and overall performance of a building. Yet the technical considerations ...
Sponsored
Designing sustainability into construction – proof over promises in sustainable construction
With tightening regulations and growing client demand, the construction industry is under increasing pressure to demonstrate measurable progress against carbon reduction targets. For specifiers, that ...
Construction Products
Dulux Trade launches new solution for high-humidity spaces
Because of how they are used, kitchens and bathrooms experience more moisture, more contact, and more ongoing maintenance. Standard emulsions are not designed for this level of use. Over time, ...
Specifying your lock
On September 14th 2017, three neighbouring Staffordshire families woke up to the news that their cars had been stolen - including one model valued at over £35,000. Each house had been a victim of ...
Design and SpecificationConstruction Products
Reduce embodied carbon from the start
Measure, compare and reduce upfront embodied carbon using trusted UK data and pre-built assemblies.
There are hundreds of gadgets you can use to measure, document and design more effectively on both large and small scale construction projects, but it was a very bright idea indeed to integrate these ...
Design and SpecificationConstruction Products
Phase change materials
What are PCMs and why do we use them? Phase change materials (PCMs) are substances with a high latent heat of fusion.¹ They store latent heat during the transition phase. A PCM absorbs thermal energy ...
Design and SpecificationConstruction Products
Should we be building our houses with LEGO bricks?
With its unique interlocking tube design and potential to build an infinite number of structures, it’s no wonder that the humble LEGO brick has stood the test of time. The original patent was signed ...
Design and SpecificationConstruction Products
Can BIM successfully deliver small construction projects?
The perceived value of BIM BIM is more than just developing a 3D model: it entails a collaborative way of working to deliver masses of information over a Common Data Environment (CDE) – a digitised ...
Design and SpecificationDigital Transformation
Specifications - the views from the industry
The findings in the NBS Specification Report 2017 provide us with a good understanding when it comes to the industry's experience of specifications and future expectations. Clearly, specifications ...
Design and SpecificationSpecification
Subscribe
The alternative to last-minute specification writing
Challenges A specification is a key contract document, typically produced during the technical design stage of a project. It is issued as part of the tender documentation and used throughout the ...
Design and SpecificationSpecification
Passive fire protection: Specifying and maintaining fire doors
What is a fire door? How many of us fully appreciate the importance of fire doors as life-saving components in the buildings that we occupy and use every day, either at our place of business or home?
Design and SpecificationDigital Transformation
Are you BIM ready? What your business needs to do before 2016 (5/10)
The UK government has mandated that all centrally-funded work is to be undertaken using BIM by 2016. This is now less than 12 months away, and for those organizations that haven't yet done so, this ...
Digital TransformationSpecification
Are you BIM ready? What your business needs to do before 2016 (4/10)
The UK government has mandated that all centrally-funded work is to be undertaken using BIM by 2016. This is now less than 12 months away, and for those organizations that haven't yet done so, this ...
Digital TransformationSpecification
Are you BIM ready? What your business needs to do before 2016 (3/10)
The UK government has mandated that all centrally-funded work is to be undertaken using BIM by 2016. This is now less than 12 months away, and for those organisations that haven't yet done so, this ...
Digital TransformationSpecification
Are you BIM ready? What your business needs to do before 2016 (2/10)
The UK government has mandated that all centrally-funded work is to be undertaken using BIM by 2016. This is now less than 12 months away, and for those organisations that haven’t yet done so, this ...