Constructing the 2013 Serpentine Gallery

Constructing the 2013 Serpentine Gallery

Oct 15, 2013 |NBS

The 2013 Serpentine Gallery Pavilion, by architect Sou Fujimoto, is a metallic mesh of 27,000 bits of steel joined together to give the impression of a light, cloud-like structure.

In this programme we talk to the AECOM engineers that worked alongside Fujimoto to help realise his design. We learn why the architect’s original designs had to be rapidly rationalised and how an exceedingly tight schedule ultimately dictated the final design and how it was built.

Key learning points:

  • The Serpentine Gallery Pavilion brief explained
  • Why Sou Fujimoto’s initial design was ruled out by AECOM
  • How the team built the pavilion using only one 2-D drawing
  • What were the building’s thousands of nodes and how were they made?
  • What were the advantages of off-site construction?

About the contributors

Tom Webster, Associate Director, Building Engineering, AECOM, heads up AECOM’s project team on the Serpentine Pavilion. Since joining AECOM in 2005, he has become a leading figure in a boundary-changing group that has developed bespoke design tools to create some of the world’s most complex buildings and stadiums.

No stranger to working in pressured environments, Tom has helped deliver designs for nine venues in just four months for the 2016 Rio Games, along with the new 42,000-seat stadium for Spartak Moscow.

Harriet Eldred, Senior Engineer, Building Engineering, AECOM, and joint-winner of the 2013 Young Structural Engineer of the Year, has worked with the design team to develop the Pavilion’s matrix-like structure. Since joining AECOM in 2009, after graduating from Cambridge University, she has worked on an array of challenging projects including stadium designs for the 2016 Rio Olympics.

Harriet has devised a complex parametric toolkit. Developed for Rio and adapted for the Serpentine, these new processes have made the exchange of information between the design team simpler and quicker, helping to deliver the architect’s vision in a matter of weeks.


RIBA CPDDisclaimer: NBS TV programmes are the intellectual property of RIBA Enterprises and it shall be a breach of this right to copy, or in any way exploit commercially or show in public any of the programmes without the express permission of RIBA Enterprises.
The information contained in the programmes is not intended and accordingly shall not be relied upon either as a substitute for professional advice or judgement or to provide legal or other advice with respect to any particular circumstance. RIBA Enterprises accepts no responsibility for loss occasioned to any person acting or refraining from action as a result of the information contained in the programmes.

Our latest articles

Uniclass - October 2026 update

Classifying the natural environment

UniclassClassification

Visqueen launches Ultimate Self Adhesive Membrane for hydrocarbon and VOC-contaminated sites

The construction industry faces growing challenges when building on increasingly complex brownfield sites. Alongside the need for effective waterproofing, developers and contractors must now address a wider range of ground contaminants, including hydrocarbons, volatile organic compounds (VOCs), and hazardous ground gases, while maintaining programme efficiency and installation quality. Against this backdrop, Visqueen has expanded its gas protection and waterproofing portfolio with the launch of Visqueen Ultimate Self Adhesive Membrane, a new hydrocarbon and VOC-resistant self-adhesive tanking membrane. Developed as the latest addition to the Visqueen non-foil gas barrier range, the new membrane combines proven gas barrier and waterproofing performance to help specifiers address multiple site challenges with a single solution.

Construction ProductsSponsored

Siderise: Helping to bridge the gap between Gateway 2 approval and on-site fire protection

While the new building safety regime hasn’t fundamentally changed what requirements higher-risk buildings (HRBs) must meet to comply with the Building Regulations, it has significantly increased the breadth, depth and volume of evidence that must be supplied to demonstrate this. As a result, project teams have had to adapt the way they work and even look beyond their roles to understand how their actions may impact the next Dutyholder in the chain. For specifiers, this can include considering what supporting services are offered with life safety-critical elements to enable correct design, installation and maintenance. Early engagement with manufacturer technical specialists can help identify any practical challenges that may arise onsite. Then, during construction, these services can help support the translation of design intent into reality so that buildings are safe for occupation.

Construction ProductsSponsored