The 'language' of construction, the relationships between the project team members and construction technology have all moved on since the RICS's old forms were printed some 20 years ago.
The programme explains how the forms account for that change and describe how to use the suite and in particular, when to use the short or standard form.
Also examined is the suite's bold approach to handling client risk in relation to other appointment forms, as well as graphics exemplifying the 'tick box' approach of the suite and the range of scope of services included.
Visqueen launches Ultimate Self Adhesive Membrane for hydrocarbon and VOC-contaminated sites
The construction industry faces growing challenges when building on increasingly complex brownfield sites. Alongside the need for effective waterproofing, developers and contractors must now address a wider range of ground contaminants, including hydrocarbons, volatile organic compounds (VOCs), and hazardous ground gases, while maintaining programme efficiency and installation quality. Against this backdrop, Visqueen has expanded its gas protection and waterproofing portfolio with the launch of Visqueen Ultimate Self Adhesive Membrane, a new hydrocarbon and VOC-resistant self-adhesive tanking membrane. Developed as the latest addition to the Visqueen non-foil gas barrier range, the new membrane combines proven gas barrier and waterproofing performance to help specifiers address multiple site challenges with a single solution.
Construction ProductsSponsored
Siderise: Helping to bridge the gap between Gateway 2 approval and on-site fire protection
While the new building safety regime hasn’t fundamentally changed what requirements higher-risk buildings (HRBs) must meet to comply with the Building Regulations, it has significantly increased the breadth, depth and volume of evidence that must be supplied to demonstrate this. As a result, project teams have had to adapt the way they work and even look beyond their roles to understand how their actions may impact the next Dutyholder in the chain. For specifiers, this can include considering what supporting services are offered with life safety-critical elements to enable correct design, installation and maintenance. Early engagement with manufacturer technical specialists can help identify any practical challenges that may arise onsite. Then, during construction, these services can help support the translation of design intent into reality so that buildings are safe for occupation.