Design incorporating work at height

Oct 8, 2012 |NBS

When it comes to reducing the risk of falls from height, what responsibility do architects have to site operatives during the design/ construction phase and to those that will use and maintain the building post completion?

The programme is a studio-based interview with architect and CDM-co-ordinator Paul Bussey from Scott Brownrigg. Against the backdrop of the current Working at Height Regulations, Paul sets out the dangers and explains the delicate balance that architects must strike between giving clients what they want and ensuring that those constructing and maintaining the building do not face unreasonable levels of risk while carrying out their work.

Key learning points:

  • An overview of the WHRs
  • In terms of the risk of falling from height, what are the potential danger areas on site?
  • What are MEWPs and BMUs
  • Is roped access the least safe option when it comes to maintenance?
  • An introduction to The Lofstedt Review and the forthcoming BS 8560

About the contributor

Paul Bussey, Dip.Arch Hons RIBA RMaPs MIFireE, has 35 years experience in architecture. A degree in Architecture from Liverpool University was followed by three years in Zambia. After qualifying back in the UK, Paul spent 19 years with London practice RHWL.

Paul joined Scott Brownrigg in 2005. A registered CDM-C he currently chairs the architectural CDM designers group DIOHAS, with representation on the HSE's CONIAC Working Group evaluating the 2007 CDM Regulations, and other government led partnership groups.

He is also vice-chairman of the London Region and National Representative on the Council of the Association for Project Safety and also chairs a British Standards working group writing a new BS 8560 on Design for Working at Height.

RIBA CPDDisclaimer: NBS TV programmes are the intellectual property of RIBA Enterprises and it shall be a breach of this right to copy, or in any way exploit commercially or show in public any of the programmes without the express permission of RIBA Enterprises.
The information contained in the programmes is not intended and accordingly shall not be relied upon either as a substitute for professional advice or judgement or to provide legal or other advice with respect to any particular circumstance. RIBA Enterprises accepts no responsibility for loss occasioned to any person acting or refraining from action as a result of the information contained in the programmes.
 

Our latest articles

Visqueen launches Ultimate Self Adhesive Membrane for hydrocarbon and VOC-contaminated sites

The construction industry faces growing challenges when building on increasingly complex brownfield sites. Alongside the need for effective waterproofing, developers and contractors must now address a wider range of ground contaminants, including hydrocarbons, volatile organic compounds (VOCs), and hazardous ground gases, while maintaining programme efficiency and installation quality. Against this backdrop, Visqueen has expanded its gas protection and waterproofing portfolio with the launch of Visqueen Ultimate Self Adhesive Membrane, a new hydrocarbon and VOC-resistant self-adhesive tanking membrane. Developed as the latest addition to the Visqueen non-foil gas barrier range, the new membrane combines proven gas barrier and waterproofing performance to help specifiers address multiple site challenges with a single solution.

Construction ProductsSponsored

Siderise: Helping to bridge the gap between Gateway 2 approval and on-site fire protection

While the new building safety regime hasn’t fundamentally changed what requirements higher-risk buildings (HRBs) must meet to comply with the Building Regulations, it has significantly increased the breadth, depth and volume of evidence that must be supplied to demonstrate this. As a result, project teams have had to adapt the way they work and even look beyond their roles to understand how their actions may impact the next Dutyholder in the chain. For specifiers, this can include considering what supporting services are offered with life safety-critical elements to enable correct design, installation and maintenance. Early engagement with manufacturer technical specialists can help identify any practical challenges that may arise onsite. Then, during construction, these services can help support the translation of design intent into reality so that buildings are safe for occupation.

Construction ProductsSponsored

RIBA CPD for Architects: Understanding Flooring Specification and Detailing

For architects and specifiers, flooring details can have a significant impact on the safety, accessibility, durability and overall performance of a building. Yet the technical considerations surrounding stairways, floor transitions, and floor finishes are not always straightforward.

RIBA CPDSponsored