A wide range of interesting articles that help you make informed decisions and deliver the best projects for your clients authored by our team of NBS subject specialists and construction industry contributors.
Writing clear and concise specifications is crucial on construction projects. A well-structured specification is not only essential for design success but can also prevent delays, unexpected costs and disputes. Here are five essential tips to help you get it right, from our Best Practice Guide to Specification Writing.
One handy email packed with construction
knowledge. Sign up today.
The programme advises designers and contractors what to consider when specifying and installing water systems such as spray taps, shower units and toilet flushing systems. It also focuses on the Legionnaires' outbreak of 2002 at the Barrow-in-Furness Arts Centre, including the legal consequences for the architect.
Against a backdrop of site footage, Amazonails founder, Barbara Jones explains the various preparations made before the first bale is secured to the ladder plate and the process of laying the wall begins in earnest.
Dominated for more than 100 years by light industry, the 2.5 km2 site was contaminated and its waterways choked. Beginning with the ODA's head of infrastructure, Simon Wright, we learn about the scale of the task faced by Atkins, the firm charged with leading what was to become the most comprehensive enabling works ever undertaken in the UK.
Developed by a wide range of industry representatives over a ten-year period, its assessments are becoming an essential benchmark for many civil engineering projects large or small and this programme looks at some of the main components of the scheme.
Craig White of White Design and ModCell – one of the firms behind the BaleHaus – explains the difference in ethos between traditional straw bale construction and the semi-industrialised panelised technology used by ModCell.
This programme takes a look at how the NEC3 Engineering and Construction Contract, and in particular its programme, can help site teams achieve higher levels of success.
Graham North, national treasurer of the party wall surveyors' group Pyramus & Thisbe, explains the protocol required for the appointment of a surveyor or surveyors, how notice of work should be served, and how an 'award' is created and what it contains – including the all-important conditions survey.